Pictures were taken during installation , and some little finishing were not done yet . the final touch was done after .
a little wood of 4 cm is normally coming on the top of the gap . it was done by the carpenter after i left unfortunately , but in France , having work force avable at this time of the year is a bit challenging .
Ther mirror was the "piece de resistence " of the all site , about 200 kg weight wall to wall by mm , we had to have 7 men carried it up
a little wood of 4 cm is normally coming on the top of the gap . it was done by the carpenter after i left unfortunately , but in France , having work force avable at this time of the year is a bit challenging .
No comments:
Post a Comment